Decorative chevron

Botswana Rail Prefeasibility for New Links

Government of Republic of Botswana

CPCS, as lead firm, conducted pre-feasibility studies for Trans-Kalahari Railway (TKR), Mmamabula–Ellisras Link, and Mosetse–Kazungula Link. In phase 1, CPCS conducted a comprehensive set of traffic studies for the three links; wrote a prefeasibility report of TKR with port options; and recommended a preferred route and port option. In Phase 2, CPCS updated the traffic studies, and evaluated the Mmamabula–Lephalale and Mosetse–Kazungula links, including how TKR’s development would impact them.